Pack 6 containing Issues 27-32 of our Agora Models 1:200 scale RMS Titanic has us spending all of our time working on the engine room. Not only do we assembly the starboard Engine assembly, but we add a bunch of details such as machinery, valves, and pipes to the port side components! For this pack, I spent a lot of time repainting many of these parts in various colors to make them look more interesting.
Category Archives: BUILDS
Miura Stages 51-58
In Stages 51-58 (Pack 7) of our Agora Models 1:8 scale Lamborghini Miura build, we assemble the Right Door and Rear Window and then begin work on the Front Frame section!
Ladder 9 Stages 50-57
Pack 8 containing Stages 50-57 of our 1:24 scale FDNY Tower Ladder 9 model includes completing the ladder Platform ‘bucket’ assembly, attaching both rear Wheel Arch Covers, adding many Box Frame Roof Section details, and a variety of tools. We also completed the installation of our custom lighting mods!
K.I.T.T. Stages 19-22
In Stages 19-22 of our 1:8 scale Knight Rider K.I.T.T. build, we begin assembly of the Turbine engine!
Iron Man Issues 63-66
Issues 63-66 of our Iron Man Mk III Armor build adds more details to the Right Leg and begins construction of the Central Leg Supports!
Titanic Issues 21-26
Pack 5 containing Issues 21-26 of our Agora Models 1:200 scale RMS Titanic has us adding two more Hull sections, the Port Anchor and retracting mechanism, more interior lighting, a ton of superstructure window frames, the Forward Well Deck Bulkhead, and the start of the engine room with the port Thrust Block. Not only was there much to do, but I painted many things along the way and even added frosted window ‘glass’ to my build. I am loving this partwork so far!
K.I.T.T. Stages 15-18
In Stages 15-18 of our 1:8 Knight Rider K.I.T.T. build, we complete the Front Right Wheel Arch and Radiator assemblies and attach the Front Right Wheel!
Miura Stages 43-50
In Stages 43-50 (Pack 6) of our Agora Models 1:8 scale Lamborghini Miura build, we complete the detailing of the Cockpit Floor and Steering Column, then move on to the Interior Roof Panel and Central Bodywork!
K.I.T.T. Stages 11-14
In Stages 11-14 of our Fanhome 1:8 Knight Rider K.I.T.T. build, we connect the large metal Chassis Center Section as well as begin working on the Front Wheel Arch assemblies!
Iron Man Issues 59-62
Issues 59-62 of our Iron Man Mk III Armor statuette build involve assembling more lower Right Leg parts and we connect the Right Foot!