Issues 75-78 of our Iron Man Mk III Armor build include attaching both Shoulder Plates and starting on the Arm Base assembly that will support the Shoulder Joints and allow the arms to be positioned!
Monthly Archives: March 2023
Miura Stages 67-74
In Stages 67-74 (Pack 9) of our 1:8 scale Lamborghini Miura build, we install both front Brake Discs/Calipers, the Front Crossbar, the Radiator with Cooling Fans and Hoses, the Spare Wheel, and a bunch of great details to our Front Frame assembly!
Ladder 9 Stages 63-69
Pack 10 containing Stages 63-69 of our FDNY Tower Ladder 9 model mostly contains the aerial Boom Reels and Midsections!
K.I.T.T. Stages 27-30
In Stages 27-30 of our 1:8 scale Knight Rider K.I.T.T. build, we do some great things. We finish up the Turbine engine and install it, as well as extend the Chassis to its full length and attach the Battery Compartment. But, I did run into problems when attaching all the hoses in Stages 28-29. Thankfully, with some persistence and research, I think we figured them all out!