Pack 4 containing Issues 15-20 of our Agora Models 1:200 scale RMS Titanic sees us attach more bow hull sections, our second Funnel, the first class entrance Superstructure, the first LED lights, and a ton of additional details. I also add a lot of custom paintwork along the way!
Monthly Archives: October 2022
Iron Man Issues 55-58
Issues 55-58 of our Iron Man Mk III Armor build are the last issues I had piled up waiting for the back issues. Here, we receive many parts of the Right Thigh and start work on the Right Leg!
K.I.T.T. Stages 7-10
In Stages 7-10 of our Fanhome 1:8 Knight Rider K.I.T.T. build, we complete the majority of the Front Suspension, Steering System, and the Front Brake Lines!
Iron Man Issues 51-54
As we catch up on our Iron Man Mk III Armor build, Issues 51-54 includes details for the Right Hip and Right Thigh as well as the assembly of the Right Knee and Lower Right Leg!
Miura Stages 25-33
During Pack 4 of our Agora Models 1:8 scale Lamborghini Miura partwork model, we work on the Rear Frame of the car including the suspension, shock absorbers, exhaust system, and the Left Rear Brake system. This includes Stages 25-33.
Iron Man Issues 47-50
We are cruising right along now with Issues 47-50 of our Iron Man Mk III Armor build completed. In these issues, we complete the Right Foot and begin work on the Right Knee Joint!
Titanic Issues 9-14
Pack 3 containing Issues 9-14 of our Agora Models 1:200 scale RMS Titanic adds more forward Hull sections, Engine details and first Funnel as well as the beginnings of our Forward Well Deck and Officers’ Quarters!
Iron Man Issues 43-46
Now that we are back to building our Iron Man Mk III Armor partwork build, we have just completed Issues 43-46. Here we add some armor plates to the Left Leg and begin work on the Right Foot. We also received our fourth FREE gift – a Powerbank!
Ladder 9 Stages 44-49
Pack 7 containing Stages 44-49 of our 1:24 scale FDNY Tower Ladder 9 model includes the final Storage Compartments as well as more small details and lights. However, we also attach the main body assemblies together into one piece!
Iron Man Issues 39-42
After a long delay, Issues 39-42 of our Iron Man Mk III Armor partwork build finally arrived. In these issues, we focus on the Lower Left Leg, attaching the Foot, as well as adding internal structures, details, and movable flaps. We even added some additional color along the way!