We have completed the build of our Terminator T-800 with final Issues 115-120. These issues include the final details of the Display Base and see us constructing the Stand and the Remote Control. I even went crazy on customizing the entire surface of the base!
He looks so intimidating and creepy with the lights!
After a short delay, our Enterprise D build continues with Stages 43-46. We not only add a few more Deck Panels and finish up the Battle Section Neck, but we also light up the entire upper saucer for the first time and begin to work on completing our warp nacelle!
In the final Issues 97-100 of our Star Wars R2-D2 partwork build, we install the Camera and Dome Circuit Board, label and connect a ton of wiring, mount the body panel and dome assemblies, and power him up for the first time!
Recently, I have been seeing advertisements in the US from Eaglemoss about their 1:8 scale NISSAN GT-R Nismo (R35) partwork. This partwork was only available in Japan for the longest time, so I feel I had share the big news that we may see it appear in the United States!
I have completed all of the stages of our Eaglemoss 1:900 scale U.S.S. Enterprise NCC-1701-D build I had on hand, but we have run into another out-of-stock problem with the next shipment. Unfortunately, Stage 45 is unavailable at Eaglemoss and there is no ETA.
We have finished the build of our Nissan GT-R with Packs 95-100 consisting of the the rest of the Trunk Lid, the Rear Bumper and tail lights, and closing up the Body to the Chassis! Sadly, the Carpets usually found in Pack 100 do not seem to be available any longer.