A whole magazine is dedicated to building and attaching the Right Door to our Nissan GT-R build with Packs 87-90!
Monthly Archives: October 2021
Charger Stages 91-95
In Stages 91-95 of our Dodge Charger R/T build, we install the Right Door and start on the front end of the car!
Enterprise D Stages 31-34
After a short hiatus, Stages 31-34 of our Enterprise D build are complete, including a ton of wiring and lighting!
Ladder 9 Stages 01-08
Yes, a new build has begun! In cooperation with Agora Models, we are starting the 1:24 scale FDNY Tower Ladder 9 partwork model!
As a former firefighter, fire apparatus are very dear to my heart and I could not wait to get started. With Pack 1 containing Stages 01-08, we are building a couple of the cab doors, the Cab Roof, the Front Bumper, the ladder platform, and the Rear Axle with wheels, among other bits.
The quality has been epic so far, check it out!
Routemaster Bus Released
Agora Models has just released yet another large-scale partwork build: the 1961 London Routemaster RM857 Bus! Some may recognize it as the same model that was previously available from Hachette Partworks, but this time it will enjoy the added benefits of the Agora Advantage.
This 1:12 scale 1961 London Routemaster RM 857 Bus includes the following features:
This build is available with a 12 or 24 month payment plan and will arrive in 12 shipments over that period of time. If you are interested in assembling this fantastic model, head over to Agora Model’s 1961 London Routemaster RM857 Bus page!
GT-R Packs 83-86
After a ten-month delay waiting for parts, we can finally resume the Nissan GT-R build by completing the Left Door in Packs 83-86!
Eleanor Kits 47-54
We knocked out two more issues (Kits 47-54)of our Eleanor Mustang which finished off the front suspension, added the Exhaust Pipes, and started construction of the beautiful interior and Dashboard!
Eleanor Kits 43-46
During Kits 43-46 of our Eleanor Mustang, we build the steering system and attach our Front Wheels to the Chassis!
Charger Stages 86-90
The Left Door is attached to the Body and the Right Door construction begins for our Dodge Charger R/T with Stages 86-90!
R2-D2 Issues 91-96
We are approaching the finish line with our Star Wars R2-D2 robotic model. In Issues 91-96, we install the main framework electronic boxes and begin construction of the dome motor assembly!