The last steps of the Mercedes 300 SL Gullwing are finished and the entire build is now complete. Check out Phases 98-101!
Monthly Archives: August 2021
Eleanor Kits 35-38
Kits 35-38 complete end extend the rear end of the Chassis on our Eleanor Mustang, including the fourth wheel!
We also received the fifth and final FREE gift, the Display Base:
R2-D2 Issues 86-90
Work continues on our Star Wars R2-D2 with Issues 86-90. Here, we complete and connect the three Front Body panels, build the Dome Support assembly, and begin construction of the Bottom Panel and center foot!
Charger Stages 71-75
Issue 17 containing Stages 71-75 of our Dodge Charger R/T partwork include the Roof Frame, Tail Lights, some Boot parts, and a new Distributor Cap!
I also replaced all of the original bright blue Spark Plug Wires for some more realistic looking black ones:
300 SL Phases 95-98
The entire Undertray and most of the exhaust system of our Mercedes 300 SL Gullwing is assembled and attached with Phases 95-98!
Ecto-1 Stages 87-90
Stages 87-90 (Issue 24) of our Ghostbusters Ecto-1 build adds the Left Rear Door and the Left Rear Windows!
Eleanor Kits 31-34
R2-D2 Issues 81-85
It has been a few months since I worked on this model, but Issues 81-85 of the Star Wars R2-D2 build have now been completed!
Charger Stages 67-70
The body Windows and Roof are added to our Dodge Charger R/T build in Stages 67-70!
300 SL Phases 91-94
We complete the body assembly and start on the underside of our Mercedes 300 SL Gullwing in Phases 91-94!