We continue the Fanhome 1:3 scale Iron Man Mk III Armor build with Issues 3-6 and some very iconic bits of the armor!
Monthly Archives: July 2021
Window Sanding Fixture
If you saw my Eaglemoss Enterprise D Windows mod page, you know I have been sanding all of the saucer windows down to be more flush with the hull plating.
I was trying to put a ‘group buy’ together to get this little metal creation of mine into other builder’s hands. However, my CNC shop did not get back to me about it. I decided it would be even better just to publish my 3D files to everyone. With these, you should be able to find a local CNC/Waterjet shop to have these made locally.
Check out the Windows page over at my Enterprise D site for more details! The download links can be found at the bottom of the page.
Charger Stages 61-65
Ecto-1 Stages 83-86
We attach the Left Front Door and start building the Left Rear Door on our Ghostbusters Ecto-1 with Stages 83-86!
Enterprise D 31+ Delayed
Due to the Display Stand being out of stock at Eaglemoss, Stages 31+ of the U.S.S. Enterprise NCC-1701-D are now delayed.
300 SL Phases 87-90
The rest of the Wheel Arch Liners are added and we conduct the ‘marriage’ of the Body to the Chassis in Phases 87-90 of our Mercedes 300 SL Gullwing!
Charger Stages 56-60
The Dashboard is finished and the interior (with Roll Cage) is installed on the Chassis of our Dodge Charger R/T build in Stages 56-60!
Door Transfer Kit
Instead of the oversized door stickers provided by Eaglemoss for our Ghostbusters Ecto-1 build, I have installed the fantastic rub-on Door Transfer Kit from Mike Lane!
Ecto-1 Stages 79-82
300 SL Phases 83-86
We complete the Trunk Floor and start on the wheel liners of the Mercedes Gullwing during Phases 83-86!