The beautifully silver main body and the Side Skirts of our Nissan GT-R arrives with Packs 63-66!
Monthly Archives: September 2020
DeLorean Issues 98-103
We wrap up September’s building marathon of the Back to the Future DeLorean with Issues 98-103. These issues had us building and lighting the front Power Coils (Flux Bands) as well as adding the wiring along both sides of the car!
Ecto-1 Stages 35-38
Three issues of the Ghostbusters Ecto-1 arrived in September, so here at Stages 35-38 to cap off a busy month. In these stages, we build the Battery Box (fuel tank), Steering Wheel, and start on our Cadillac’s Dashboard!
DeLorean Issues 91-97
I promised myself to take a big swing at the Back to the Future DeLorean this month. And now, Issues 91-97 are complete. This includes the mating of the Body to Chassis (probably the most difficult step in the build), attaching the front/rear bumpers, and installing the Valances!
DeLorean Heel and Toe Pads
A recent mod from Mike Lane is these Heel and Toe Pads for our Back to the Future DeLorean!
DeLorean Issues 86-90
It took two months, but I have finally wrangled up the rest of the issues I need to finish the Back to the Future DeLorean. Eaglemoss was taking too long and I found everything I needed on the Facebook groups and Amazon Japan.
Starting back up with Issues 86-90, we completed the interior and added the Engine Cover to our Body assembly!
DB5 Packs 59-62
This month on the James Bond DB5, we build out Packs 59-62 including the rest of the Bulletproof Screen mechanism and the Left Rear Wheel!
T-800 Issues 59-66
Ecto-1 Stages 27-34
In a lengthy session, I cranked out Stages 27-34 of the Ghostbusters Ecto-1. These stages involved the firewall and associated details, the Exhaust system, the Rear Axle and Suspension, as well as both rear wheels!
300 SL Delayed Again
Our Mercedes 300 SL build is on hold again, awaiting Phases 51 and on.