I only had time for a single session with the Nissan GT-R, but there was a lot to do. Here, we built up Packs 55-62 which complete the Dashboard and add the rear side interior panels. We also received and/or installed the main Motherboard and Brake Pedal Switch, remote Key Controller, LEDs/Wiring, and the Trunk. Finally, we have a chance to test the lighting before attaching the engine bay, front suspension/wheels and interior assemblies to the chassis!
Monthly Archives: August 2020
Ecto-1 Stages 23-26
With Stages 23-26 of our Ghostbusters Ecto-1 now complete, we have installed the Rear Chassis, fender liners, front engine wall with Radiator, Horns, and replica engine bay electrical bits including the Battery!
Charger Stages 25-28
In Stages 25-28 of our Dodge Charger R/T, we built up the Firewall, engine bay, front wheel arches, and Front Engine Housing Panel!
DB5 Packs 55-58
In Packs 55-58 of the James Bond DB5, we finish up our Rear Seat and start building the Trunk and Bulletproof Screen Housing!