Our second May shipment of the Nissan GT-R includes Packs 43-46 which has us finish the front left suspension, store the Front Half Shafts, and start on the front right suspension!
Monthly Archives: May 2020
Ecto-1 Delayed
Eaglemoss does not have any of the free gift Ghostbuster Ecto-1 hats to ship, so they are holding up our build.
Ecto-1 Front Strobes
I was able to get my hands on an early Strobes Mod from Model Modz for our Ghostbusters Ecto-1!
T-800 Finger Mod
There is finally a fix for the floppy fingers of our Terminator T-800 build. This is the Finger Mod from Model Modz!
DB5 Packs 43-46
With this session of the James Bond DB5 build, Packs 43-46 have us completing the Right Door and starting on the Roof Interior!
DeLorean Wireless 1 to 6 Switch
Another fantastic mod from Model Modz is their Wireless 1 to 6 Switch for the Back to the Future DeLorean!
DeLorean Issue 74
Unfortunately, when I did finally receive Issue 74 of the Back to the Future DeLorean, I broke the screws and had to order another. Now, months later, we can finally finish and attach the right side Door!
Charger Stages 17-20
This month on the Dodge Charger R/T build, we take Stages 17-20 and finish the engine and install it and the Steering Box into the Front Chassis!
Ecto-1 Stages 11-14
The first half of the Ghostbusters Ecto-1 Stages 11-14 involve finishing up the Engine, then we move onto the Front Chassis Frame and our Front Left Suspension!
GT-R Packs 39-42
We should receive two Nissan GT-R shipments this month, so let’s start with the first one (Issue 11). This issue includes Packs 39-42 containing the Battery Box and wiring, a front wheel, and the beginning of the front left suspension!