With the James Bond DB5 build, Packs 23-26 involve assembling the Steering Column and Dashboard!
Monthly Archives: November 2019
GT-R Delayed
Packs 19-22 of the Nissan GT-R are delayed with an ETA of January 2020. Boo!
R2-D2 Issues 42-50
In Issues 42-50 of our Star Wars R2-D2 build, we mostly continue working on the Left Leg and build another LED indicator!
300 SL Phases 23-26
Phases 23-26 of the Mercedes 300 SL Gullwing include the rest of the rear drivetrain!
DeLorean Issues 51-58
Work continues on the interior of our Back to the Future DeLorean. We add more wiring details, install and test the main circuit board, and start the rear bulkhead (including the Flux Capacitor) in Issues 51-58!
DB5 Packs 19-22
In Packs 19-22 of our James Bond DB5, we are building the second front wheel!
R2-D2 Issues 35-41
Not a lot of time to build this session, but I completed Issues 35-41 of the Star Wars R2-D2 containing Luke’s Lightsaber and its Tube/Motor, and the start of our Left Leg!
300 SL Phases 19-22
On the Mercedes 300 SL Gullwing, we complete Phases 19-22 with the Front Suspension and first pieces of the Rear Suspension!